Strong clients are often key to good
buildings. Strong clients have a clear vision of what they require and pursue this in interactions with professional
teams, contractors, funders, occupants and facilities managers. The mandate of
the Department of Environment (DEA) made it essential that they aimed for a green
building. The decision to use a Public Private Partnership (PPP) model to
develop their building provided a number of valuable mechanisms to support the
achievement of a green building. These included:
- A Request for Proposals (RFP) process which
required bidders to assemble comprehensive project teams including a full
design team, a facilities management team, a contractor and financial and legal
teams. This enabled project proposals to
cover a wide range of aspects related to the building including designs,
specifications, facilities management systems, procurement policies and management
models. In this way integration from the outset was supported and the client
was able to carry out detailed evaluations of proposals before selecting and
appointing a bidder.
- Detailed RFP documentation where performance
requirements could be specified. This enabled DEA to set energy efficiency,
renewable energy, water efficiency, indoor environmental quality and
landscaping targets. This ensured that
proposed approaches and designs could be developed within defined parameters
and performance evaluated in an objective and structured manner.
- A contract negotiation period where a clear
understanding of the requirements and enforcement mechanisms were developed
between DEA and the bidder. This ensured
that bidders fully understood DEA’s green building intentions and the proposed
mechanisms that would be used to ensure that targets were achieved.
- A
PPP agreement which specified design and operational requirements and set out
how these would evaluated and reported on. This agreement included penalty regimes that would be employed to ensure targets
were achieved.

While opinions may be divided about the
suitability of PPP processes in South Africa, the DEA project indicates that it
can provide an effective way of procuring a green building. The DEA building
has received a 6 star Greenstar rating from the GBCSA and is currently the
largest building in South Africa to achieve this level of performance. Gauge
was the Sustainability Technical Adviser to DEA on the
project.
Further information on DEA’s building can
be found at:
http://www.engineeringnews.co.za/article/six-green-stars-for-department-of-environmental-affairs-head-office-2013-07-19